


Chaoyang Hongda Machinery Co., Ltd in March 14, 2000 registration, located in Chaoyang City, Liaoning Province, high-hech industrial zone. Covers an area of 27000m2,construction area of 14000m2,existing staff of 158 people. Company fooers machining, welding, chain rollers, assembly, suface treatment five plants and sales, technical, production and other department offices. Products related to artificial board,paper,power generation(biomass,thermal power),ca...[Detailed]
Recently, the top-level design of the national modern infrastructure system has clarified the future direction: construction will place greater emphasis on the integration of in...[Detailed]
Recently, China's first fully automated intelligent mining system for open-pit coal mines, covering multiple processes such as loading, transportation, waste dumping, and coal s...[Detailed]
Under the crazy sweep of the new energy wave, the downstream value chain of construction machinery is rapidly achieving a "pure electrification" transition. However, as the most...[Detailed]